HTML type Attribute
❮ HTML
- tag
- Coffee
- Tea
- Milk
- element, palpable content.
- , and elements.
- HTML
- CSS
- JAVA
- SASS
- HTML
- CSS
- JAVA
- SASS
- List item
- List item
- List item
- html ul types
- number paragraphs in html
- html dot symbol
- ordered list html mdn
- reverse ol order html
- html bullet symbol
- html long text three dots
- ol list showing without numbers
- html ordered list tag
- html ol roman numerals
- roman numeral html
- ordered list roman numerals html
- change list numbers to roman html
- roman numerals list html
- roman number list in html
- roman numbering in html
- how to make an ordered list with roman numerals in html
- html roman numerals
- html ul roman numerals
- ul li order roman numerals
- how to list elements in roman numerals in html css
- html ordered list roman numnerals
- html list roman numbers
- tag for ordered list with small roman numbers
- html list with roman numerals
- roman numeral list html
- ordered list in html roman numerals
- ordered list with roman numerals html
- ol roman numbers in list in html
- css ordered list roman numerals
- in html, to create a numbered list of roman numerals we use the ………… attribute inside the ol . tag
- roman numbers html list
- how to list in roman in html
- roman numerals list in html
Example
An ordered list with uppercase roman numbers:
More "Try it Yourself" examples below.
: The Ordered List element
The HTML element represents an ordered list of items — typically rendered as a numbered list.
Flow content, and if the
|
Zero or more |
None, both the starting and ending tag are mandatory. |
Any element that accepts flow content. |
list |
directory, group, listbox, menu, menubar, none, presentation, radiogroup, tablist, toolbar, tree |
HTMLOListElement |
How to create a list with roman number indexing in HTML ?
In this article, We are going to create a list with roman number indexing. In HTML, A list is a record of short pieces of information, such as people’s names, usually written or printed with a single thing on each line and ordered in a way that makes a particular thing easy to find.
Approach: There are different types of lists in HTML. One of them is Ordered list or ol. Ordered list uses
- tag. To create an ordered list with roman number indexing we will use attribute type. The type attribute of the
- tag defines the numbering type of the list items. The default value of the type attribute in the ordered list is number. So for example, if we want the list with alphabets we simply give value “a” to type attribute. Similarly for creating a list with roman number indexing we have to provide the first roman number value to the type attribute.
Syntax:
Below is the implementation of the above approach.
Example 1: In this example, we will create a list with uppercase roman number indexing. For that, we will provide attribute type value to “I”.
HTML
h2 { color: green; }
Ordered List with Roman Numbers
|
Output:
GFG
Example 2: Now we will create a list with lowercase roman number indexing. The entire code will be the same as before we will just change the type attribute value from “I” to “i” now.
HTML
h2 { color: green; }
Ordered List with LowerCase Roman Numbers
|
Output:
GFG
Article Tags :
HTML
Web Technologies
HTML-Attributes
HTML-Questions
HTML-Tags
Practice Tags :
HTML
Read Full Article
How to add uppercase roman numbers with CSS
To create a list with uppercase roman numbers you need to override the default decimal style numbers, with the CSS property list-style-type:
ol { list-style-type: upper-roman; }
Uppercase roman numbers example:
“ordered list with roman numerals html” Code Answer
ordered list with roman numerals html
html by MaxBruss on Oct 05 2021 Comment
1
Add a Grepper Answer